Design-Build Advantages / Disadvantages
The design build process is a construction project delivery system that appoints a single sole member full responsibility to design and build a construction project. This method is employed in both new home construction and home renovation as an alternative to the traditional design-bid-build method. The design-bid-build method is the generally accepted home building procedure where the owner directly hires the home designer to design the home. When the plans and product selections are complete, the owner will invite general contractors to prepare bids for the home's construction.
The design build home construction delivery method has become the
generally accepted home contraction and remodeling practice for the last
decade. This project delivery system has become a preferred contracting method
for owners to rely on due to the greater advantages over the traditional
delivery methods. We will discuss the advantages and disadvantages of this home
design to build process.
What is Design Build
The design to build construction process is a project delivery
method that begins with the owners contracting with a general contractor to be
fully responsible for both design and the construction their home project.
General contractors will either directly hire a third party home designer and
structural engineer or have an internal staff to conduct the home design. This
method is fundamentally different then the traditional design-bid-build method
because this process requires the general contractor to be fully responsible to
the owner for both design and construction. Thereby dramatically reducing the
owners overall risk and expense in the project .
Advantages
Single Source Responsibility - At the very heart of the definition
of design build is the single source accountability of your general contractor.
The general contractor and the owner enter into a design build contract that
requires the general contractor to facilitate the home design (new home
construction or home renovation) project. The general
contractor (master builder) in turn designs and builds to the
architectural, lifestyle and financial criteria provided by the owner.
The design build process effectively transfers the owners risk
normally associated with the traditional design-bid-build method to the general
contractor. If there are design errors or omissions in the construction
documents, the general contractor is fully accountable for these mistakes
instead of the owner. If there are incomplete design documents that result in
additional expense, the general contractor will absorb the consequences.
Cost Savings - The design build process reduces overall
project cost through the efficiency of the complete process. It saves expense
by streamlining the entire home design ,therefore reducing both the timeline
and general contractors claims for design errors. Plan errors and omissions
would normally be charged at the expense of the owner by the general contractor
in the form of change orders.
This delivery method also contributes to cost savings by the
inherent ability of the general contractor and home designer to collaborate in
value engineering the design. By working in a cooperating tandem, the home
designer has a viable partner in quantifying and qualifying conceptual design
construction cost
Time Savings - The time savings contribution from the
design build method are principally the results of the process efficiencies.
The general contractor provides the design budget pricing throughout the entire
design process. As the home design and product selection evolves so does the
construction budget accuracy. The efficiency occurs by eliminating both the bid
procurement and any time required to redesign to maintain budget goals.
In the design-bid-build method, if the owners initial construction
budget is not realized after bids are accepted, the owner must request the home
designer to either re-design the plans or value engineer the plans and
specifications to reduce construction cost to meet the budget or accept and
live with the higher pricing.
Reduced Claims Exposure - Change orders are a common
occurrence in construction projects caused by both design and owners. Some
change orders result from owners changing their minds, while others result from
design errors and omissions. The design build method reduces these types of
cost exposures by transferring them to the general www.marwoodconstruction.com
713-818-1720 info@marwoodconstruction.com All Rights Reserved by Marwood
Construction contractor. The design build contracting method makes the general
contractor principally responsibility to the owner for these claim expenses as
previously discussed.
Value Engineering - As the design process evolves the owner
may insist on specific architectural features or design elements while wanting
to maintain the construction budget. The general contractor will be required at
these times to value engineer the design in an effort to reduce construction or
product cost in other areas of the home design.
The value engineering is also commonly done by the master builder
and home designer as the design evolves. The general contractor will identify
highly expensive features and discuss their perceived value with the client
during design. The owner then is able to approach the home design concept from
a value proposition perspective.
Optimum Project Efficiency - The design build method is a
more efficient process then the traditional design-bid-build method. The design
build method is a collaborating process between owner, general contractor and
home design members. This collaborating effort is often referred to as the
design team. The master builder leads the design team to achieved the desired
goals developed during the conceptual design phase.
Quiet frequently the traditional design-bid-build method in
contrast is often burdened by ego conflicts and finger pointing between builder
and home designer. The architect blames the builder for not following fine
print construction specifications and the builder will blame the home designer
for design problems. This conflict can lead to either or both parties not
representing the best interest of the owner and focusing on turf protecting.
Anyone that has experienced a one of a kind design and build has usually
witnessed this occurrence at some point during the design or construction
phases.
Greater Owner Project Control - The design build method
provides the owner greater control over the entire design and construction cost
than the traditional design-bid-build method. As has been presented, that there
are greater cost savings, time savings and lesser risk of claims and liability
experienced by the owner during design and construction.
Disadvantages
Owners Lesser Control over Design - The owner
may sacrifice some control over the complete design as they experience
trade-offs between the budget and design. This is not an characteristic unique
to the design build process. Owners face the same sacrifice decisions in the
design-bid-build method, although at a greater expense when plans are completed
before they discover these factors.
Lack of Competitive Pricing - Critics say that the lack of
competitive bidding by the design build process points to its greatest flaw in
serving the interest of the client. By the mere fact of the design build method
contracting with a single source appointment, by default eliminates the
traditional competitive bidding component from the process. The nature of the
design build method is a best value approach instead of a competitive bid
solicitation approach.
This very issue is what the design build method critics suggest as
the primary limitation of this project delivery approach. The critics claim
that design build inherently allows the master builder to ignore competitive
subcontractor bidding which results in price escalation.
There are many different structured contract methods that can be
used to mitigate such risk for the owner. They run the full gamut of shared
risk from such higher builder risk contracts like lump sum to lower shared risk
contracts such as project management contracts.
The fundamental nature in construction contracting is managing the
alignment and risk associated with the unknowns of a construction project. It
is the owners responsibility to access and evaluate these risks in determining
their risk tolerance. These findings guide them to a contracting method that
makes them comfortable with acceptance of price and risk.
The Construction Industry Institute has studied the merits of each
of the project delivery approaches. The Institute concluded that the design
build process was the most economical and efficient project delivery system in
the building and construction industry. The Institute found that the greatest
obstacle that the design build system faces in popular acceptance is educating
owners of the benefits and merits.
Source Url. https://www.marwoodconstruction.com/wp-content/uploads/2017/01/Design-Build-Advantages-Disadvantages.pdf